Home / Directory / List News / Detail News

Black & Veatch to design and deliver desal plant for Freeport Indonesia’s Manyar smelter

im-mining.com

Thu 29 Dec 2022, 08:00 AM

Share

Events

PT Freeport Indonesia (PTFI) has appointed Black & Veatch to design and manage the delivery of a seawater desalination plant for its Manyar Smelter in East Java, Indonesia, as part of its sustainable development commitments.

The seawater desalination plant will support the processing of mine concentrates from the Grasberg mine in West Papua. The new domestic copper smelter and refinery supports Indonesia’s downstreaming strategy to further refine the processed mine concentrates and brings additional economic value to the local community and Indonesia.

“Reducing water consumption is critical to our sustainable development commitments. Using alternative water supplies is key to resource conservation. Black & Veatch’s extensive experience with alternative water technologies helps position us for continued sustainable business growth,” said Horst-Dieter Garz, Executive Vice President, Corporate Planning and Business Strategy, PTFI.

Black & Veatch, in collaboration with its joint operating agreement (JOA) partner PT Wika, will perform the engineering, procurement, construction and commissioning responsibilities for the seawater desalination plant.

“The mining industry plays a critical role in the global shift to a decarbonized and sustainable future. Accessing water from the ocean saves freshwater resources for the local community and ecosystems and ensures a more sustainable, resilient and reliable water future. It also improves efficiencies and reduces operational risks and downtime that affect business profitability,” said Narsingh Chaudhary (pictured), Executive Vice President & Managing Director, Asia Pacific, Black & Veatch.

 The seawater desalination plant will be located adjacent to the Manyar Smelter Project. It will produce over 1,400 m3/h of desalinated seawater to support the copper smelter and precious metals refinery. Designed to process 1.7 Mt/y of copper concentrate, the $3 billion Manyar Smelter is anticipated to be the world’s largest designed single line copper processing facility.

BHP previously hired Black & Veatch to serve as designer and engineer of record on the Escondida Water Supply Expansion (EWSE) project at its Minera Escondida mine in Chile. The project supplies the world’s largest copper mine with 100% desalinated water, removing the need for groundwater.

Image source; PT Freeport Indonesia

Source: https://im-mining.com/2022/12/22/black-veatch-to-design-and-deliver-desal-plant-for-freeport-indonesias-manyar-smelter/

Advertisement

Relate News

News
02 Feb 2024, 12:00 PM

Export ban since June 2023, bauxite smelter is still stalled

CNBC Indonesia/Muhammad Choirul Anwar
2974 Views
News
21 Mar 2022, 13:18 PM

Kapuas Prima Coal (ZINC) Spur Sales Amid Commodity Price Rally

www.industri.kontan.co.id
3113 Views
News
05 Jul 2023, 09:00 AM

Atlas Resources (ARII) Aims 4.3 Million Tons sales in 2023

www.emitennews.com
3097 Views
News
03 Apr 2023, 12:00 PM

Highest Record During Operation, RMK Energy Records a Profit of IDR 404.1 Billion in 2022

bisnis.tempo.co
4002 Views
Hello! We would like to talk to you.Please fill the details below to start chatting with us.