Home / Directory / List News / Detail News

China Disburses IDR 4.6 Trillion for Coal Mining Project in South Kalimantan

PT Sumber Daya Energi

Wed 20 Dec 2023, 08:00 AM

Share

Events

Qinfa Group Ltd., through PT Sumber Daya Energi (SDE) has so far disbursed a budget worth USD 300 million or the equivalent of IDR 4.6 trillion to build the SDE 1 underground coal mine area, out of the three planned SDE mine locations in Kotabaru, South Kalimantan.

The mine with a depth of 180 square kilometers is estimated to be able to produce up to 15 years, with mineable coal reserves of 293 metric tons.

Deputy for Investment Services at the Ministry of Investment, Ahmad Idrus, said that the Qinfa Group's investment in South Kalimantan is expected to be able to trigger national economic growth and investment realization targets.

"Investment from the Qinfa Group is very important and strategic in the context of realizing this investment," said Ahmad Idrus at the 'Inauguration of the First Production of the SDE 1 Underground Plant', Monday (18/12/2023).

Ahmad Idrus said that the Ministry of Investment will support Qinfa Group in terms of licensing. Apart from that, the government will also support from a non-licensing perspective, for example fiscal facilities such as tax holiday.

President Director China Qinfa Group, Xu Da, added that his party is committed to creating a positive impact, including job opportunities and empowering MSMEs around the region mine. 

"We are committed to improving and having a positive impact on economic growth, both locally and nationally," he said.

Meanwhile, the value of this investment will continue to increase, in line with PT SDE's plans to build SDE 2 and 3 mines. Each existing mine is designed to produce 10 million tons of coal per year.

The SDE 1 mine itself has officially started production starting today, Monday (18/12/2023), while the SDE 2 mine is targeted to start operating in 2024.

For Information, PT SDE is the holder of a mining business permit (IUP) for foreign investment (PMA). in accordance with the Decree of the Minister of Investment/BKPM No.4/1/IUP/PMA/2023 dated 9 February 2023 with a validity period of up to 14 May 2034 with an area of ​​18,500 hectares.

In carrying out mining activities, PT SDE uses underground mining methods. According to the Feasibility Study Approval document and environmental documents, PT SDE has a maximum coal production capacity of 20 million tons per year, which will make PT SDE the largest coal mining company in Indonesia that produces coal using underground mining methods.

Image source: PT Sumber Daya Energi

Source: www.ekonomi.bisnis.com/China Kucurkan Rp4,6 Triliun untuk Proyek Tambang Batu Bara di Kalsel

Advertisement

Relate News

News
27 Dec 2022, 09:00 AM

Indonesia Confirms Bauxite Export Ban To Proceed As Scheduled

www.mining.com
2626 Views
News
09 Nov 2023, 09:00 AM

U.S. senators oppose Indonesia FTA that paves way for nickel subsidies

Reuters
2459 Views
News
24 Nov 2022, 08:00 AM

Huayou Cobalt awards tailings filtration equipment order to Metso Outotec

im-mining.com
2940 Views
News
17 Jul 2024, 20:30 PM

Delta Dunia Group Acquires US Mining Company USD 122.4 Million

deltadunia.com
1506 Views
Hello! We would like to talk to you.Please fill the details below to start chatting with us.