Indonesia Miner
Welcome to Indonesia Miner
Home / Directory / List News / Detail News

Freeport Targets Copper Cathode Production at Gresik Smelter to Operate in August 2024

Shutterstock/tss

Thu 19 Oct 2023, 09:00 AM

Share

Events

PT Freeport Indonesia is targeting its smelter located in Gresik, East Java to be able to produce copper cathodes in August 2024.

VP Government Relations Jakarta and Smelter Technical Support PT Freeport Indonesia Harry Pancasakti said that the smelter that is being built will complete its physical construction at the end of 2023, or in about two months.

According to Harry, when the main equipment has been installed and from January to May 2024, pre-commissioning and commissioning activities will be able to be completed.

"Insha Allah, in June 2024 we will start the operational phase of this new smelter," said Harry at the SOE & Economic Forum in Jakarta, on Thursday (12/10).

"We will only be able to start producing concentrate purified into copper cathodes in August 2024," he explained.

On that occasion, Harry also said that the smelter that was being built was the smelter with the largest single line design in the world. This smelter will have a copper smelter capacity of 1.7 million tons per year.

Previously, President Joko Widodo (Jokowi) emphasized that smelters were the foundation for Indonesia to become a developed country in the future.

The Head of State said that the existence of several smelter factories in the country would increase Indonesia's competitiveness and change economic dependence from the consumption sector to the production sector.

Jokowi also encouraged the production results from the smelter factory to be integrated with the results of other mining commodities spread across various regions in the country. Starting from nickel in Sulawesi, bauxite in Bintan and West Kalimantan, tin in Bangka Belitung, to copper foil in Gresik.

"So it will be integrated into EV batteries, lithium batteries, and it will be integrated again into electric vehicles," he said some time ago.

He also hopes that the smelter factory construction project, which has reached 72%, will be completed next year. "We hope that everything will be completed before May 2024," he said.

Image source: Shutterstock/tss

Source: www.gatra.com/Freeport Targetkan Produksi Katoda Tembaga Di Smelter Gresik Beroperasi Agustus 2024

Advertisement

Relate News

News
30 Nov 2023, 08:00 AM

Adaro Minerals (ADMR) Will Develop 3 More Mines

ADMR
1752 Views
News
28 Jul 2023, 10:00 AM

Huayou Cobalt boosts nickel capacity in Indonesia

Huayou Cobalt
1856 Views
News
14 Jul 2023, 12:00 PM

Toka Tindung Gold Exploration, Archi Indonesia (ARCI) Spent IDR 60.2 Billion

EmitenNews.com
1914 Views
News
18 May 2023, 12:00 PM

Building a Nickel Smelter, Bukaka Teknik Utama Optimistic to Expand US and Europe Markets

industri.kontan.co.id
2133 Views
Hello! We would like to talk to you.Please fill the details below to start chatting with us.